Reference · Timeline

PUI Law compliance calendar for 2026

A single timeline with the key dates of PUI compliance: the federal track and the Mexico City track, what is already in force and what is still pending as of June 2026. Built so a manager, a consultant or a lawyer can see at a glance what each stage requires and what is yet to switch on.

How to read this calendar

PUI compliance does not happen on a single date, but in stages. First came the law; then its administrative rules; then the technical specifications of the connection; and the manual that enables full interconnection is still missing. Telling these stages apart avoids two common errors: believing that “nothing applies until the final manual is out” or, conversely, believing that “you already have to be interconnected.”

It is also worth separating two planes that are sometimes mixed: the federal one, which is PUI proper, derived from the LGMDFP; and the Mexico City one, which has its own local regulation of commercial establishments and tourism. They are distinct obligations, with distinct authorities and dates. They appear on the same line here so you can see them together, without confusing them.

The dates that follow are attributed to the corresponding official publication and reflect the state known as of June 2026. Where something is pending, it is said clearly, because an honest calendar is worth more than one that feigns certainty.

The federal PUI timeline

The stages, in order, with their publication date and what each one activates.

  1. July 2025 — The law creates the obligationThe LGMDFP reform is published. Art. 12 Bis (lodging obligation) and Art. 43 Bis (penalty) are born. From here, identity registration is the underlying duty.
  2. 27 November 2025 — GuidelinesThe Guidelines developing how to comply with registration and prepare are published in the DOF. Administrative compliance is defined.
  3. 23 January 2026 — Technical Manual v1.0The DOF publishes the technical specifications of the connection: REST/JSON, JWT, AES-256-GCM encryption, SHA3-256 hashing and TLS. The “how to connect” is now on the table.
  4. Pending — SNIP Operations ManualNot yet published as of June 2026. When it appears, it opens 45 business days to request access to the system, a requirement for granting it. It closes full interconnection.

The state as of June 2026

What is already enforceable, what is published and what is still on hold.

Identity registration: enforceable

The duty to register the guest’s identity is already in force. It does not depend on any pending manual.

Guidelines: published

The administrative framework of compliance has been in force since 27 November 2025.

Technical Manual: published

The connection specifications have been available since 23 January 2026; you can already design against them.

SNIP Operations Manual: pending

Full interconnection awaits this publication. Once out, the 45-business-day window to request access begins to run.

Mexico City: separate local rule

Mexico City has its own obligations for commercial establishments and tourism, with their own dates and authorities.

Penalty: in force

Art. 43 Bis sets 10,000 to 20,000 UMA per infraction, roughly $1,173,100 to $2,346,200 MXN at the 2026 UMA of $117.31.

The Mexico City plane

Beyond the federal obligation, Mexico City has its own local regulation covering commercial establishments and tourism service providers. It is a framework distinct from federal PUI: another authority, another basis and another calendar. A lodging in Mexico City must therefore attend to both planes without assuming that complying with one satisfies the other.

The method recommendation is to treat the federal and the local as two parallel tracks. Federal PUI is governed by the LGMDFP and its DOF instruments; the Mexico City obligation is governed by the city’s own regulation. To avoid mistakes, verify each plane against its source and do not extrapolate dates from one to the other.

What to do today according to the calendar

The sensible reading of the calendar is this: start registering identity now, because that obligation is already enforceable and does not wait for any manual; and have the interconnection prepared to switch on the moment the SNIP Operations Manual is published. Whoever leaves everything for the final manual risks racing against the clock once the 45-business-day window begins.

PUIhoteles, a certified connector linked to R2 OS in real time, has you capturing identity from day one and leaves the interconnection ready to switch on when SNIP allows it. Its setup is $4,350 MXN plus $930 MXN per month (plus VAT), with no lock-in.

Frequently asked questions about the compliance calendar

Since when is registering the guest’s identity enforceable?
Since the July 2025 LGMDFP reform took effect, reinforced by the 27 November 2025 Guidelines. Identity registration is already a duty in force as of June 2026.
Do I already have to be interconnected to the system?
Full interconnection awaits publication of the SNIP Operations Manual, pending as of June 2026. Once published, it opens a 45-business-day window to request access. In the meantime, what is enforceable is registering identity.
What is the 45-business-day window?
It is the period that, as foreseen, will run from the publication of the SNIP Operations Manual for establishments to request access to the system. It is a requirement for granting that access.
Is the Mexico City obligation the same as the federal one?
No. Mexico City has its own local regulation for commercial establishments and tourism, with distinct authorities and dates. Complying with the federal track does not replace the local one or vice versa.
How much is the penalty for non-compliance with PUI?
Art. 43 Bis of the LGMDFP sets 10,000 to 20,000 UMA per infraction, which at the 2026 UMA of $117.31 is roughly between $1,173,100 and $2,346,200 MXN.
Is it worth waiting for the final manual to start?
No. Identity registration is already enforceable and does not depend on the pending manual. Starting now avoids racing against the clock once the 45-business-day interconnection window begins.

Put PUIhoteles to work for you

Get started